Choosing when orders and operations should start is central to production planning. Forward and backward scheduling approach the question from different directions.
Forward scheduling
Starting from an available start time, operations are planned forwards to determine when the order can finish. This can support early use of resources, reveal completion dates and allow explicit buffers. Starting early may also increase work in progress.
Backward scheduling
Starting from a required delivery date, operations are planned backwards to determine when work needs to begin. This can reduce unnecessary early production and tied-up capital, provided that material, capacity and timing assumptions are feasible.
Combine approaches to suit the operation
Delivery commitments, machine loading, material availability and staffing affect the choice. Real processes also include failures, variable durations and supply delays. A planning method needs to account for the constraints relevant to the decision.
⚙️ Evaluate scheduling policies with Simio RPS
Simulation-based, risk-aware scheduling can compare the consequences of alternative policies. Assess completion times, resource use and exposure to disruption rather than relying only on one deterministic result.
In machine and plant engineering, backward planning from a committed delivery date can be compared with earlier starts or different machine assignments. In a logistics centre, priorities may change depending on whether rapid completion or lower work in progress is more important.
These examples illustrate trade-offs to be evaluated in a suitable model. Contact us to discuss your scheduling requirements.