The blockage of the Suez Canal in March 2021 highlighted the vulnerability of globally connected supply chains. A disruption at a major transport link can delay materials, affect production and force expensive changes to logistics.
Look beyond the immediate delay
Longer journeys and unavailable components can affect factories, warehouses and customer deliveries at different times. Understanding these dependencies helps teams distinguish urgent responses from longer-term changes.
⚙️ Compare alternatives in a model
A material flow simulation can represent suppliers, transport links and production. Scenarios can examine a blocked route, alternative ports or modes, longer lead times and different safety stocks. Compare cost, timing and production consequences under explicit assumptions.
An illustrative engineering scenario
A machine builder awaiting critical parts could compare normal sea transport with alternative routes or air freight for selected components. The model can assess which shortages constrain production and how different responses change delivery risk.
This is an illustration of the method rather than a documented customer case. Simulation does not predict every disruption, but it helps evaluate contingency strategies and understand the trade-offs between inventory, cost and resilience.
Contact us to discuss supply chain modelling with Simio.