Scheduling across several factories requires coordination of local equipment, staff, materials and inter-site transport. Variable durations, failures and changing orders can affect more than one location.
Represent the network
A Simio RPS model can include the relevant resources and transport relationships at each site. With suitable data connections, current operating information can support scenario assessment. Visualisation and Gantt views help explain dependencies and proposed assignments.
🔎 Questions for risk-aware scheduling
- Which site can process an order within the required constraints?
- How does a local bottleneck affect other sites?
- What are the consequences of a machine failure or changed order?
- How do alternative assignments affect transport, utilisation and delivery risk?
An illustrative three-site supplier
An automotive supplier operating three European factories could represent their capacities and transport links in one model. Scenarios could compare order allocation and responses to material or equipment restrictions. Effects on delivery time, cost and utilisation would be measured rather than assumed.
Simulation supports coordination and a more explicit assessment of risk. It does not guarantee optimal resource use or every delivery commitment. Contact us to discuss multi-site planning with Simio RPS.