Some rough-cut planning approaches assume capacity can be adjusted freely. Real factories have limited machines, materials and people, and are affected by failures, delays and variable process times. Plans need to reflect these constraints.
🗓️ Recognise the limits of a planning model
A plan based on idealised capacity or average times may require frequent intervention when actual conditions differ. Planning algorithms can also be difficult to interpret, leaving users uncertain about how a schedule will respond to disruption. The relevant question is which constraints and uncertainties a particular system actually represents.
Simulation-based and risk-aware scheduling
Simio RPS can model finite resources, process dependencies and variability. Instead of looking only at average outcomes, repeated scenario runs can help assess the spread of completion times and the exposure of delivery commitments to risk.
- Represent equipment failures, transport delays and resource restrictions.
- Compare buffers and alternative operating policies.
- Evaluate schedule robustness under stated assumptions.
- Reassess alternatives when orders or resources change.
- Explain planning choices through results and visualisation.
An automotive assembly example
Assembly with many variants and just-in-sequence deliveries depends on coordination across suppliers and production stages. A body-shop failure, a late supplier or an order change may disrupt a tightly packed schedule.
One scenario could examine a major supplier arriving twelve hours late. The model can show where shortages and queues emerge, then compare material rerouting or revised shifts. This is an illustrative scenario, not a reported customer result.
Simulation helps assess realistic alternatives rather than guaranteeing a disruption-proof schedule. Discuss with us how Simio RPS could complement or replace elements of your existing planning approach.