Short delivery times, many product variants, cost pressure and sustainability objectives place competing demands on manufacturing. Plans based on fixed times and ideal conditions may miss the interactions between equipment, transport and staff.
⚙️ Understand the process with simulation
A material flow model represents machines, routes, storage and people, including buffers and bottlenecks. It helps compare changes before investment and assess their effects on utilisation, lead time and output.
Assess plans under changing conditions
Simulation-based scheduling can include variable durations, machine downtime, changing orders and restricted staff availability. Scenarios help evaluate delivery risk, buffer requirements and alternatives when the operating situation changes.
⚙️ Simio and Simio RPS
Simio supports visual process models and three-dimensional animation. Simio RPS applies simulation to risk-aware planning and scheduling. Suitable interfaces can connect models to ERP, MES and other systems. Scope and integration must be designed for the actual application, from a small workshop to a larger network.
Examples of questions
- Machine and plant engineering: how do setup policies and cycle times affect output?
- Automotive: how should variant production and delivery commitments be coordinated?
- Food production: how do fluctuating demand and supply restrictions affect a feasible plan?
Simulation supports informed decisions rather than guaranteeing a particular saving or quality outcome. Contact us to discuss the application in your factory.