Simulation for better decisions.Markus Bans · >30 years of experience

ATS Pro. · Simio Simulation

Thirty years of digital twins

A retrospective on the development from process models to connected digital twins and scheduling applications.

Over several decades, digital representations of production and logistics have progressed from planning and visualisation tools towards connected operational models. This retrospective describes that development without implying that every modern twin has the same capabilities.

⚙️ Early process models

Models helped make production systems understandable and compare planned changes. Computing limits and the effort required to collect and maintain data restricted the scope of many applications.

More capable simulation

Advances in hardware and modelling software supported larger and more detailed studies of layouts, transport and capacity. Simulation became a practical basis for comparing alternatives before investment.

⚙️ Connected models

Industrial networking and operational data made it possible to update models more regularly. Connections to ERP, MES and equipment systems can provide current orders and resource states. The degree of integration varies by application.

From representation to planning

Simulation-based scheduling can use the model to compare plans under uncertainty, assess urgent orders and evaluate responses to changing demand or failures. The quality of the result depends on process representation, data and validation.

An automotive supplier, for example, could model a variant-rich line and compare revised schedules when orders change. This illustrates the method rather than documenting a specific improvement result.

Contact us to discuss building a digital twin or extending an existing Simio model towards operational planning.

Let’s talk about your processes

Better decisions start with a conversation.