Use production simulation to find bottlenecks and see which changes could shorten lead times or increase capacity.
Improve production and shorten lead times
To optimise manufacturing, identify where orders wait and which machines limit output. Compare setup sequences, batch sizes and buffers with Simio to see which changes improve performance.
For lean management and continuous improvement, teams can test proposed changes in the model and compare their effects on throughput, inventory and lead times.
Factory simulation with Simio: assess plant-wide changes
Model production lines, buffers and internal transport together. Test whether an extra machine increases output or shifts the bottleneck downstream.
Manufacturing and production optimisation
Use Simio to identify which station limits throughput and see whether the bottleneck shifts when you add a machine or change buffer sizes. Model a proposed production line to estimate capacity and test ways to increase it. Compare changes that could minimise setup times and shorten lead times.
To optimise changeovers, use Simio to compare job sequences and setup rules. This shows which options reduce setup times and how they affect throughput and delivery dates. A setup matrix can represent changeover times between products.
🔎 Identify production bottlenecks
Production simulation and manufacturing simulation assess machines, staff, material supply and order sequences together. Simulate manufacturing processes to compare how these elements interact. Explore capacity requirements and the effects of failures or a changing product mix.

Factory simulation can connect several lines, storage areas and transport routes. To simulate an entire factory, the model combines the relevant processes and their interactions. Scope follows the decision. For operational planning, explore capacity and production scheduling with Simio RPS.
Using simulation in production planning makes the interaction between workstations, resources, buffers and material flows visible. It helps investigate bottlenecks, lead times and the effects of changing demand or capacity.
Compare proposed layouts, staffing levels and operating strategies in the model. We support the project from the initial question through modelling and evaluation.
Project example: coordinate injection moulding, buffers and finishing with Simio