A large international chemical company planned to expand its adhesives and elastomers production. Increasing volumes and fluctuating workloads raised the question of whether existing buffers and mixing capacity would be sufficient or additional equipment would be needed.

The challenge
Chemical production involves closely connected process steps and complex material flows. Changes in workload or resource availability can overload individual facilities. The uncertainties concerned mixer numbers, buffer sizes, the effect of staffing and the actual production capacity limit.
🎯 The objective
The project aimed to establish a technically and economically sound production design: stable operation during peaks, appropriately sized buffers, effective use of equipment and personnel, and a reliable investment basis.
The approach
A Simio model represented the production and material flow processes using actual production data. Scenarios varied order loads, buffer capacities, mixing equipment and staffing. They were evaluated using output, travel times, resource utilisation and costs.
💡 Customer benefits
The analysis established the production capacity limit and appropriate mixer and buffer capacities. It supported shorter internal transport and walking distances, the avoidance of unnecessary equipment investment and informed decisions about expansion.