A cold-rolled coil manufacturer used simulation to compare machine locations, heavy-duty forklift numbers and production capacity.

A medium-sized cold-rolled coil manufacturer planned to expand production with additional machinery. Alongside the extra capacity, the company needed to decide where to position the machines and how many heavy-duty forklifts would be required.

Project example: Layout and intralogistics optimization at a medium-sized manufacturer of cold strip coils

The challenge

Heavy materials and frequent internal transport make production performance sensitive to layout changes. Uncertainties concerned machine locations, forklift fleet size, transport distances and the production capacity limit. Overordering forklifts would increase investment and operating costs; too few would create logistical bottlenecks.

🎯 The objective

The project sought an economical expansion with short internal routes, demand-based fleet sizing, high output without unnecessary investment and a sound basis for layout decisions.

The approach

A Simio model of the factory layout was built from actual production and transport data. Scenarios varied machine positions, forklift numbers and order or load conditions. Evaluation covered distance travelled, transport utilisation, costs and maximum achievable output.

💡 Customer benefits

The project identified shorter transport routes, an appropriate number of heavy-duty forklifts and the production capacity limit. Simulation supported the layout and investment decisions, helping the company expand production while reducing investment risk.

Contact us for a free, non-binding initial conversation about your planning question.

Let’s talk about your processes