Project examples
Project examples for production, logistics and supply chain planning.
Project: optimising a door sorting system
A door manufacturer used Simio to assess sorter module capacity and release strategies before committing to additional investment.
ExploreProject: assembly lines and buffers for automotive seats
A Tier-1 automotive seat supplier compared synchronous and asynchronous assembly lines, buffer capacity and floor-space requirements.
ExploreProject: layout and intralogistics for cold-rolled coils
A cold-rolled coil manufacturer used simulation to compare machine locations, heavy-duty forklift numbers and production capacity.
ExploreProject: buffer strategies for a pocket sorter
A footwear logistics operator compared pocket-sorter buffer capacity, storage strategies and access performance using real order data.
ExploreProject: buffers, mixers and transport in chemical production
An adhesives and elastomers producer assessed mixers, buffers, staffing and the capacity limit before expanding production.
ExploreProject: workstation concepts for frozen fish packing
A frozen fish packing company compared workstation designs, staffing and qualifications to evaluate labour costs, output and quality risks.
ExploreProject: layouts and forklifts in packaging production
A packaging manufacturer compared buffer and rack locations, forklift assignments and fleet sizes to improve internal logistics.
ExploreProject: production sequencing in electronics
An electronics manufacturer compared job release and priority rules to improve delivery performance, work in progress and setup effort.
ExploreProject: capacity and investment planning in engine manufacturing
An engine manufacturer assessed the capacity of existing production and the conditions under which an additional line would be needed.
ExploreProject: resources and capacity in parcel sorting
A parcel logistics company assessed staffing, swap bodies and transport vehicles for normal operations and seasonal peaks.
ExploreProject: pharmaceutical packaging processes
A pharmaceutical company assessed the feasibility and resources of a multi-stage packaging process, including transport and buffers.
ExploreProject: resources and lead times in therapy processes
A therapy-facility process study compared treatment structures and resources to balance waiting times, utilisation and investment.
ExploreProject: scrap logistics in steelmaking
A steel producer compared scrap container availability, crane operating areas and wagon loading strategies in a Simio model.
ExploreProject: resources and staffing in aerosol can production
An aerosol can manufacturer assessed machines, tools, staff, forklifts, staging areas, batch sizes and tool maintenance strategies.
ExploreProject: optimising injection moulding production with Simio
Coordinate up to 48 injection moulding machines, limited buffers and downstream operations with Simio, balancing output and intermediate inventory.
ExploreProject: international supply chain simulation
A logistics consultancy and ATS used simulation to compare transport fleets, delivery intervals and depots in an international supply chain.
ExploreProject: warehouse organisation and staffing in food logistics
A food distribution warehouse compared staffing, storage locations and picking strategies using an automatically generated Simio model.
ExploreAnalysing and optimising electricity supply with Simio
Project example: investigating production demand, on-site generation and grid electricity supply over time.
ExploreProject demonstration videos
An existing demonstration video provides a further route into the project examples and a discussion of your planning task.